Gas pipeline construction and assembly South section

  • Martorell (Barcelona) – Figueres (Girona)

Characteristics:

• Length (km): 89.6
• Diameter (in): 36” (914 mm)
• Pressure (bar): 80
• Pipe: API5L Grade X-70

Key data:

• 6 valve positions
• 2.200 m horizontal drilling 48”
• 2.250.000 m³ of earthworks
• 23.000 m³ concrete for protection
• 2 automatic welding lines (6+3 cabins)

Automatic welding line
Heavy earthmoving machine
Construction of rockfill for land restoration (59.000 m³ placed)
Crossing the River Llobregat.
Concentric ballasting of pipeline with reinforced concrete.
Underwater trench laying.

Related projects

Gasoducto de Santa Cruz de Mudela salida a Cuenca, Ciudad Real

Santa Cruz de Mudela gas pipeline outlet, Cuenca

Construcción y montaje de gasoducto Falces - Irurzun, Navarra

Construction and assembly Falces - Irurzun gas pipeline

BBV gas pipeline construction, Arbós (Tarragona) - Barcelona plant section

Gas pipeline in Albacete (Castilla la Mancha) - Montesa (Valencia), Almansa variants

Construcción y montaje gasoducto Gallur-Tauste-Ejea de los Caballeros

Construction and assembly of the Gallur-Tauste-Ejea de los Caballeros gas pipeline

Construcción y montaje gasoducto Tivissa (Tarragona) - Paterna (Valencia), tramo 3

Construction and assembly of the Tivissa (Tarragona) - Paterna (Valencia) gas pipeline, section 3

Construcción y montaje gasoducto Lorca (Murcia) – Chinchilla (Albacete) tramo II Norte

Construction and assembly of a gas pipeline in Lorca (Murcia) – Chinchilla (Albacete), section II North