DP Tordera-Planta del Ter artery project, DP Tordera-Fogars de la Selva section
-
Barcelona
Construction of a hydraulic infrastructure consisting of 16 km of 1,400 mm spiral-welded steel pipeline and 3.2 km of 400 mm pipeline, both rated for 40 atm, along with a pumping station with a total power of 2,000 kW (four 750 kW pumps) and a flow rate of 600 l/s.
The works include large-scale earthworks, installation of pipelines and accessories (valves, bends, and air valves), construction of a 3,000 m³ underground tank and technical rooms, as well as site development, revegetation, and landscape integration with an artistic mural.