Trillo 626 MWP photovoltaic projects
-
Guadalajara
The project involves the installation of 10 photovoltaic solar plants in Trillo, divided into two generation areas. The Budia Norte area comprises 7 solar plants with a total capacity of 338 MWp (six rated at 50 MWp and one at 38 MWp), all connected to the Las Represas 220/30 kV substation. These plants are distributed across five fenced sections (A, B, C, D, and E) to optimize the project layout and preserve wildlife corridors. The San Andrés area consists of 3 photovoltaic plants with a combined capacity of 138 MWp. Altogether, the project will have a total installed capacity of 476 MWp.









