Trillo 626 MWP photovoltaic projects

  • Guadalajara

The project involves the installation of 10 photovoltaic solar plants in Trillo, divided into two generation areas. The Budia Norte area comprises 7 solar plants with a total capacity of 338 MWp (six rated at 50 MWp and one at 38 MWp), all connected to the Las Represas 220/30 kV substation. These plants are distributed across five fenced sections (A, B, C, D, and E) to optimize the project layout and preserve wildlife corridors. The San Andrés area consists of 3 photovoltaic plants with a combined capacity of 138 MWp. Altogether, the project will have a total installed capacity of 476 MWp.

Related projects

Instalaciones plantas fotovoltaicas, Mallorca

Photovoltaic plant installations

Construcción del parque eólico de Mihai Viteazu, Rumanía

Construction of the Mihai Viteazu wind farm

Torito hydroelectric project

Instalaciones fotovoltaicas con un total 3,7 MW en depósitos y tierras, Barcelona

Photovoltaic installations in tanks and ground-mounted installations with a total of 3.7 MW

Construcción de las plantas fotovoltaicas Rebusco, Condecillo y Eruela, Ciudad Real

Construction of Rebusco photovoltaic plants

Planta termosolar Olivenza, Badajoz

Olivenza solar thermal plant

Obra civil del parque eólico de Chirnogeni. Rumanía

Civil engineering works at the Chirnogeni wind farm