Civil engineering works at the Chirnogeni wind farm

  • Romania

Execution of civil engineering works required for the construction of 24 wind turbines, each generating 2.5 MW, in the town of Chirnogeni (Constanta). The works include building:

  • Access roads to the turbines and associated drainage work.
  • Wind turbine foundations. Includes earthmoving and laying foundations.
  • Trenches and laying cables between turbines and substation.

Related projects

Instalaciones plantas fotovoltaicas, Mallorca

Photovoltaic plant installations

Proyectos fotovoltaicos trillo 626MWP, Guadalajara

Trillo 626 MWP photovoltaic projects

Construcción del parque eólico de Mihai Viteazu, Rumanía

Construction of the Mihai Viteazu wind farm

Torito hydroelectric project

Instalaciones fotovoltaicas con un total 3,7 MW en depósitos y tierras, Barcelona

Photovoltaic installations in tanks and ground-mounted installations with a total of 3.7 MW

Construcción de las plantas fotovoltaicas Rebusco, Condecillo y Eruela, Ciudad Real

Construction of Rebusco photovoltaic plants

Planta termosolar Olivenza, Badajoz

Olivenza solar thermal plant