Skip to main content

Gas pipeline construction and assembly Lorca (Murcia) – Chinchilla (Albacete) section II North

  • Murcia - Albacete

Characteristics:
• Length (km): 92,1
• Diameter (in): 42” (1.067 mm)
• Pressure (bar): 80
• Pipe: API5L Grade X-70

Key data:
• 4 valve positions
• 446 m horizontal drilling 56” (1.422 mm)
• 284.000 m³ trench excavation in rock

Crossing the River Segura
Specific earthmoving machinery
Trench in rocky terrain
Cold bending of the piping
Pipe alignment

Related projects

Gasoducto de Santa Cruz de Mudela salida a Cuenca, Ciudad Real

Santa Cruz de Mudela gas pipeline outlet, Cuenca

Construcción y montaje de gasoducto Falces - Irurzun, Navarra

Construction and assembly Falces - Irurzun gas pipeline

BBV gas pipeline construction, Arbós (Tarragona) - Barcelona plant section

Gas pipeline in Albacete (Castilla la Mancha) - Montesa (Valencia), Almansa variants

Construcción y montaje gasoducto Gallur-Tauste-Ejea de los Caballeros

Construction and assembly of the Gallur-Tauste-Ejea de los Caballeros gas pipeline

Construcción y montaje gasoducto Tivissa (Tarragona) - Paterna (Valencia), tramo 3

Construction and assembly of the Tivissa (Tarragona) - Paterna (Valencia) gas pipeline, section 3

Construcción y montaje gasoducto Martorell (Barcelona) – Figueres (Girona) tramo Sur. España.

Construction and assembly of the southern section of the gas pipeline