Gas pipeline construction and assembly Tivissa (Tarragona) - Paterna (Valencia), section 3

  • Tarragona - Valencia

Characteristics:
• Length (km): 62.880 (+1.2 km offshoot).
• Diameter (in): 40” (1.016 mm), 32” (offshoot).
• Pressure (bar): 80.
• Pipe: API5L Grade X-70.

Key data:
• 7 valve positions.
• 2.300 m horizontal drilling 52” (1.320 mm).
• 115.000 m3 excavation of trench in rock.
• 7.000 m3 concrete for protection.
• Demolition and restoration of 36.700 m of walls and irrigation channels.

Other notable performances:
• Aerial view of the gas pipeline route.
• Crossing the A-7 highway.
• Valve position with two scraper ramps.

Related projects

Gasoducto de Santa Cruz de Mudela salida a Cuenca, Ciudad Real

Santa Cruz de Mudela gas pipeline outlet, Cuenca

Construcción y montaje de gasoducto Falces - Irurzun, Navarra

Construction and assembly Falces - Irurzun gas pipeline

BBV gas pipeline construction, Arbós (Tarragona) - Barcelona plant section

Gas pipeline in Albacete (Castilla la Mancha) - Montesa (Valencia), Almansa variants

Construcción y montaje gasoducto Gallur-Tauste-Ejea de los Caballeros

Construction and assembly of the Gallur-Tauste-Ejea de los Caballeros gas pipeline

Construcción y montaje gasoducto Lorca (Murcia) – Chinchilla (Albacete) tramo II Norte

Construction and assembly of a gas pipeline in Lorca (Murcia) – Chinchilla (Albacete), section II North

Construcción y montaje gasoducto Martorell (Barcelona) – Figueres (Girona) tramo Sur. España.

Construction and assembly of the southern section of the gas pipeline