Jiloca River Regulation Dam, Teruel

  • Aragon

It includes the following components:
• Dam.
• Spillway.
• Bottom outlet and intakes.
• Pumping station.
• Replacement of the access road to Lechago.
• Internal roads.
• Administration buildings.
• Environmental impact mitigation measures.
• Erosion protection.
• Drafting the emergency plan.

Dam on the Pancrudo River some 1,300 m upstream of the mouth of the river where it empties into the Jiloca River, in the town of Calamocha (Teruel), to create a reservoir with a capacity of 18.16 hm³ at elevation 891. It is a straight rockfill dam with a clay core with a total length at the crown of 330 m, maximum height over foundation of 39 m, maximum height over riverbed of 34 m, crest elevation at 895 and crest width of 8 m.

Related projects

Proyecto de la arteria ITAM (Instalación Tratamiento Agua Marina) de Tordera-Planta del Ter, tramo ITAM Tordera-Fogars de la Selva

DP Tordera-Planta del Ter artery project, DP Tordera-Fogars de la Selva section

Sistema de saneamiento del Alto Maresme, Barcelona

L’Alt Maresme wastewater treatment system

Construcción de una planta de tratamiento y sistema de agua potable en La Joya, Perú

Construction of a treatment plant and drinking water system in La Joya

Proyecto de galerías de impermeabilización en la presa de Montearagón, Huesca

Waterproofing gallery project at the Montearagón dam

Infraestructura hidráulica general de la zona regable del nuevo Canal de Civán, Zaragoza

General hydraulic infrastructure of the irrigable area of the new Civán Canal

Construcción y explotación de la instalación desaladora de agua marina de Andratx, Mallorca

Building and operating the Andratx seawater desalination facility

Ampliación de la estación depuradora de aguas residuales de Vila-seca y Salou, Tarragona

Extension of the wastewater treatment plant in Vila-seca Salou

Depuradora de aguas residuales en Maçanet, Girona

Wastewater treatment plant in Maçanet