L’Alt Maresme wastewater treatment system

  • Barcelona

The new wastewater treatment system in l’Alt Maresme, to the north of Barcelona, consists of a pre-treatment plant, pumping station, one Wastewater Treatment Plant (WWTP) and collectors that connect the station to the WWTP. The municipalities making up the wastewater network in question are Pineda de Mar, Calella, Malgrat, Palafolls, and Santa Susanna in Barcelona province. The average treated flow is 54,000 m³/day for a population of 245,455 inhabitants.

Related projects

Proyecto de la arteria ITAM (Instalación Tratamiento Agua Marina) de Tordera-Planta del Ter, tramo ITAM Tordera-Fogars de la Selva

DP Tordera-Planta del Ter artery project, DP Tordera-Fogars de la Selva section

Presa de Regulación del río Jiloca, Teruel

Jiloca River Regulation Dam, Teruel

Construcción de una planta de tratamiento y sistema de agua potable en La Joya, Perú

Construction of a treatment plant and drinking water system in La Joya

Proyecto de galerías de impermeabilización en la presa de Montearagón, Huesca

Waterproofing gallery project at the Montearagón dam

Infraestructura hidráulica general de la zona regable del nuevo Canal de Civán, Zaragoza

General hydraulic infrastructure of the irrigable area of the new Civán Canal

Construcción y explotación de la instalación desaladora de agua marina de Andratx, Mallorca

Building and operating the Andratx seawater desalination facility

Ampliación de la estación depuradora de aguas residuales de Vila-seca y Salou, Tarragona

Extension of the wastewater treatment plant in Vila-seca Salou

Depuradora de aguas residuales en Maçanet, Girona

Wastewater treatment plant in Maçanet