Blanes Port Marina and surrounding areas
-
Blanes (Girona)
Main actions:
• Expansion of the Moll Central.
• Installation of new levers, finger pontoons, and ramps.
• Remodeling the current Moll de Ponent.
• Remodeling the Moll de Ribera.
• Dismantling the existing gas station at the Moll de Ribera and fitting a new one with greater capacity at the Moll Central.
• Building a pedestrian walkway attached to the Moll de Ponent and ending in a viewpoint.
• New service and urban development facilities.
• New access roads and urban remodeling of part of the promenade.
• New urban promenade attached to the Moll de Ponent.
• Building a sports area, refurbishment of existing facilities, and construction of a technical building for use by crews and as a cafeteria.
The buildings will be used for sports, school, and leisure activities with a fitness centre and a spa area in the building adjacent to the promenade. The remodeled area will include new hangars and sailing classrooms. The crew building is to include a terrace bar service. The buildings will be constructed with reinforced concrete frames, single footings, and columns and slabs poured onsite, except in the fitness centre and spa building which due to its use will have flooring made of hollow core planks with a 12.8 m span. It is also planned to build a reinforced concrete earth retaining wall, waterproofed and drained in its backfill, to support the hollow core planks on the promenade side.