Torito hydroelectric project

  • Costa Rica

This plant is on the right bank of the Reventazón River and  generates 50 megawatts of power, bringing Costa Rica another step towards its goal of achieving 100% renewable energy production by 2021.

Copisa’s most important contributions to the project include the construction of the water intake, the construction of a water loading chamber fitting up to 125,000 cubic meters, the assembly of large-diameter steel tanks and tubing, and the construction of the building housing the machine room, which is 40 meters tall.

The electrical substation measures 6,600 square meters in area and has a control building where the voltage is stepped up.

Related projects

Instalaciones plantas fotovoltaicas, Mallorca

Photovoltaic plant installations

Proyectos fotovoltaicos trillo 626MWP, Guadalajara

Trillo 626 MWP photovoltaic projects

Construcción del parque eólico de Mihai Viteazu, Rumanía

Construction of the Mihai Viteazu wind farm

Instalaciones fotovoltaicas con un total 3,7 MW en depósitos y tierras, Barcelona

Photovoltaic installations in tanks and ground-mounted installations with a total of 3.7 MW

Construcción de las plantas fotovoltaicas Rebusco, Condecillo y Eruela, Ciudad Real

Construction of Rebusco photovoltaic plants

Planta termosolar Olivenza, Badajoz

Olivenza solar thermal plant

Obra civil del parque eólico de Chirnogeni. Rumanía

Civil engineering works at the Chirnogeni wind farm