Wastewater treatment plant in Maçanet

  • Girona

The construction work will be executed on the plot adjacent to the current Maçanet de la Selva wastewater treatment plant on Puigtió industrial estate. The site is bordered to the south by the rest of the agricultural plot, to the east by La Torderola stream, to the west by Indústria Street and to the north by the current WWTP.

Main activities:

  • Diversion of affected watercourses.
  • Water line: the two inlet collectors (industrial estate Ø400 mm and urban area Ø630 mm).
  • Sludge, flotation, drainage and emptying lines.
  • Reagent, air, and deodorization lines: Control facility and treated water tank.
  • Electrical, automation and control, ventilation and air conditioning systems.
  • Exterior development, auxiliary services, landscaping and finishes.

Linkedin

Related projects

Proyecto de la arteria ITAM (Instalación Tratamiento Agua Marina) de Tordera-Planta del Ter, tramo ITAM Tordera-Fogars de la Selva

DP Tordera-Planta del Ter artery project, DP Tordera-Fogars de la Selva section

Presa de Regulación del río Jiloca, Teruel

Jiloca River Regulation Dam, Teruel

Sistema de saneamiento del Alto Maresme, Barcelona

L’Alt Maresme wastewater treatment system

Construcción de una planta de tratamiento y sistema de agua potable en La Joya, Perú

Construction of a treatment plant and drinking water system in La Joya

Proyecto de galerías de impermeabilización en la presa de Montearagón, Huesca

Waterproofing gallery project at the Montearagón dam

Infraestructura hidráulica general de la zona regable del nuevo Canal de Civán, Zaragoza

General hydraulic infrastructure of the irrigable area of the new Civán Canal

Construcción y explotación de la instalación desaladora de agua marina de Andratx, Mallorca

Building and operating the Andratx seawater desalination facility

Ampliación de la estación depuradora de aguas residuales de Vila-seca y Salou, Tarragona

Extension of the wastewater treatment plant in Vila-seca Salou