Skip to main content

Construction of the new Gran Via between Escultura and Miguel Hernández streets, L'Hospitalet de Llobregat

  • Barcelona

Urban redevelopment and partial undergrounding of Gran Via in L’Hospitalet de Llobregat, between Escultura Street and Miquel Hernández Street. The project includes the continuity of Amadeu Torner and Miquel Hernández streets with new roundabouts at Castelao and Can Trías, the lowering of the central carriageway (840 m out of 2,175 m), and street-level urbanization of the side roads.

It also includes vertical connections between levels, a comprehensive drainage system with storage tanks and sewer network renewal, temporary traffic diversions, relocation of affected utilities, and the implementation of a new Ferrocarrils de la Generalitat station (Amadeu Torner / Fira), with future connection to metro line L9. The side roads are configured with three lanes per one-way direction, ensuring traffic flow.

Related Projects

Urbanización del sector residencial Roca Tallada en tram Alcanar, Tarragona

Development of the Roca Tallada residential sector in Alcanar

Redevelopment of Marina Street in front of the Nativity Façade of the Sagrada Família

Redevelopment of Marina Street in front of the Nativity Façade of the Sagrada Família

Urbanització Vallparadís Terrassa, Barcelona

Urban development of Vallparadís, Terrassa

Reurbanización de la calle Balmes tramos travessera de Gràcia, Barcelona

Redevelopment of Balmes Street, Travessera de Gràcia sections

Urbanización del carrer Gran de St. Andreu, Barcelona

Developing Gran de St. Andreu Street

Urbanización Calle Almogàvers, Barcelona

Almogàvers Street urban development

Remodelación de la avenida de Paral·lel, Barcelona

Remodeling Paral·lel Avenue

Reurbanización de la calles comercio del mercado del Borne, Barcelona

Redevelopment of the commercial streets of the Borne market

Avingua Meridiana, tramo Aragón-Mallorca, Barcelona

Meridiana Avenue, Aragón-Mallorca section

Can Batlló urban development