Skip to main content

New entrances to the south extension, phase 1B, Port of Barcelona

  • Barcelona

The purpose of the work, located in the Port of Barcelona and specifically ​​in the extension of the South Breakwater in the final few metres of the artificial mouth of the Llobregat River, is the creation of new entrances to the southern extension of the Port of Barcelona. This will involve building entrances for road traffic and rail diaphragm wall boxes under the new junction, in anticipation of future works for rail entrances whose loop will exit along the old bed of the Llobregat River.

Related projects

Duplicamos la superficie del muelle de la Química en Tarragona

We have doubled the surface area of the Chemicals Quay

Ampliación de la Terminal de Contenedores de TCB. Muelle Sur. Fase 2 Puerto de Barcelona

Extension of TCB Container Terminal. South Dock. Stage 2 Port of Barcelona

Puerto Iquique. Reposición frente de atraque, Chile

Port Iquique. Berthing line replacement

Construcción y explotación de una dársena interior en el puerto de Vilanova, concebida y diseñada exclusivamente para superyates, Vilanova i la Geltrú

Construction and operation of an inner dock in the Port of Vilanova i la Geltrú

Dársena deportiva de puerto de Blanes y zonas anejas, Girona

Sports basin of the port of Blanes and surrounding areas

Obra civil de la plataforma sur estacionamiento de aeronaves, fase II, lado norte, aeropuerto de Barcelona

Civil engineering work on the south aircraft parking apron, stage II, north side, Barcelona Airport

Terminal de Contenedores de TCB. Muelle Sur del puerto de Barcelona.

TCB Container Terminal. South Dock of the Port of Barcelona

Terminal de transbordadores del puerto de Paquera, en Puntarenas. Costa Rica.

Port of Paquera Ferry Terminal