Skip to main content

Port of Paquera Ferry Terminal

  • Costa Rica

Expansion and upgrading of the Port of Paquera Ferry Terminal in Costa Rica. The aim of this project was to improve access by expanding the pre-boarding parking area, building a ring road for picking up and dropping off passengers, a new water treatment plant, sanitary facilities, and protecting structural works and improving access for boats and to the beach.

This expansion and upgrading of the port will bring numerous benefits for fishing and tourism in this area of the Nicoya Peninsula.

Linkedin

Related projects

Duplicamos la superficie del muelle de la Química en Tarragona

We have doubled the surface area of the Chemicals Quay

Ampliación de la Terminal de Contenedores de TCB. Muelle Sur. Fase 2 Puerto de Barcelona

Extension of TCB Container Terminal. South Dock. Stage 2 Port of Barcelona

Puerto Iquique. Reposición frente de atraque, Chile

Port Iquique. Berthing line replacement

Construcción y explotación de una dársena interior en el puerto de Vilanova, concebida y diseñada exclusivamente para superyates, Vilanova i la Geltrú

Construction and operation of an inner dock in the Port of Vilanova i la Geltrú

Dársena deportiva de puerto de Blanes y zonas anejas, Girona

Sports basin of the port of Blanes and surrounding areas

Nuevos accesos a la ampliación sur, fase 1B, puerto de Barcelona

New entrances to the south extension, phase 1B, Port of Barcelona

Obra civil de la plataforma sur estacionamiento de aeronaves, fase II, lado norte, aeropuerto de Barcelona

Civil engineering work on the south aircraft parking apron, stage II, north side, Barcelona Airport

Terminal de Contenedores de TCB. Muelle Sur del puerto de Barcelona.

TCB Container Terminal. South Dock of the Port of Barcelona