Skip to main content

Combined cycle 1.200 MW power station, Maasbracht

  • The Netherlands

The project consists of prefabricating piping, mechanically assembling BOP (Balance of Plant) equipment, assembling piping in the BOP and Power Island, thermal insulation, and painting. The scope of the work involves the assembly of 392 tons of equipment, the prefabrication of 631 tons of piping, and the assembly of 2,280 tons of piping, valves, and brackets.

Related projects

Ampliación planta incineradora con recuperación de energía de Son Reus, Mallorca

Expansion of the Son Reus energy recovery incinerator plant

Construcción nueva unidad de refino crudo para la obtención de combustibles, Sines

Construction of new crude oil refining unit for fuel production, Sines

Montaje mecánico Hydrocracker refinería petróleo

Mechanical assembly of hydrocracker oil refinery

Manufacturing and assembly of a modular plant

Manufacture and assembly of a modular plant

Construcción de planta de biocombustibles en Zierbana

Biofuels plant at Zierbana

Dismantling electromechanical equipment

Construction of the Facultats underground substation

Fabricación y montaje de una planta modular de CCR

Manufacture and assembly of a modular CCR plant