Construction of a new crude oil refining unit for fuel production using a hydrogenation process prior to compound fractionation. The scope of the CPI includes the mechanical assembly of the whole main hydrocracker processing unit.

The main works consisted of:

  • Prefabrication and assembly 5,200 tn. of piping in various qualities.
    • Supply, prefabrication and assembly 485 tn. of brackets.
    • Assembly of dynamic equipment
    • Assembly of static equipment
    • Steam tracing.
    • Thermal Insulation.
    • Treatment of metal surfaces.

Related projects

Ampliación planta incineradora con recuperación de energía de Son Reus, Mallorca

Expansion of the Son Reus energy recovery incinerator plant

Montaje mecánico Hydrocracker refinería petróleo

Mechanical assembly of hydrocracker oil refinery

Central Térmica de Ciclo Combinado de 1.200 MW, Maasbracht, Holanda

Combined cycle 1,200 MW power station, Maasbracht

Manufacturing and assembly of a modular plant

Manufacture and assembly of a modular plant

Construcción de planta de biocombustibles en Zierbana

Biofuels plant at Zierbana

Dismantling electromechanical equipment

Construction of the Facultats underground substation

Fabricación y montaje de una planta modular de CCR

Manufacture and assembly of a modular CCR plant