Widening the Transversal Arterial Road C-25 Highway, Gurb (Barcelona) Espinelves (Girona) stretch

  • Barcelona - Girona

The total length of the trunk road is 16.3 km. The design speed is 100 kph except in the Romegats tunnel, where the speed is reduced to 80 kph.

The solutions are compatible with maintaining traffic on both the C-25 and the intersecting cross roads.

  • Structures and walls: It includes a total of three viaducts, four overpasses, of which two of which make use of the existing structure (adaptation of barriers), two wildlife crossings, and nine underpasses. The structures of the bridge underpasses are designed in the same way as conventional viaducts. The box or frame underpasses are extensions of the existing structures. Numerous anchored walls have been designed to protect the abutments of the existing structures in the subsection with the highest number of junctions.
  • Tunnels: Three tunnels have been designed which are a doubling up in all cases, generally parallel to those already existing on the current C-25, bored and cut-and-cover (artificial tunnels). The total length of the planned tunnels is of 564.09 m (203.95 m bored; Romegats + 360.14 m cut-and-cover; Sant Julià I and II). Facilities: SOS boxes, cameras, road lighting, traffic lights, and URSs for control. Copisa has prepared the precast concrete parts storage area, installed the beams that house the bridge crane rails and provided a 200 kVA genset for operating the bridge crane.
  • Viaducts: Osormort viaduct (500.10 m long), La Font de la Riera viaduct (120 m long) and El Gurri viaduct (60.29 m long).

Related projects

Obras metro L8 de Barcelona

Barcelona Metro L8 works

Autovía Gallur Mallén, Zaragoza

Gallur-Mallén Highway

Plataforma y vía de conexión ferroviaria entre las estaciones de Atocha y Chamartín, Madrid

Railway platform and track connection between Atocha and Chamartín stations

Diseño y construcción de la Ruta Nacional Nº 3, sección: Intersección Pozuelo – Intersección Jardines del Recuerdo, incluyendo el puente sobre el río Virilla, Costa Rica

Design and construction of National Route 3 and construction of the bridge over the Virilla River

Autopista del Atlántico, AP-9. Enlace conexión complejo Ciudad de la Cultura de Santiago de Compostela, La Coruña

Atlántico motorway, AP-9. Junction Cidade da Cultura de Santiago de Compostela

Autovía Múdejar A-23. Tramo Nueno-Congosto de Isuela

Mudejar Highway A-23. Nueno-Congosto de l'Isuela section

Autovía A-44, Sierra Nevada

Sierra Nevada Highway A-44. Albolote-Santa Fe section

El mayor puente arco ferroviario de hormigón en España

The largest concrete railway arch bridge in Spain

El puente arco más grande de Cataluña

The largest arch bridge in Catalonia

Diseño y construcción del viaducto de la Ruta Nº27, de San José a Puerto Caldera, Costa Rica

Designing and building the viaduct on the Route 27 highway from San José to Puerto Caldera