Dismantling electromechanical equipment

  • Badalona

The scope of maritime work runs from the Levante sewer to the seawater intake heads.

Main measurements:

Sant Adrià 3 420 m 210 m 35 units 70 units
Sant Adrià 1-2 768 m 192 m 32 units 128 units
Badalona I 432 m 144 m 36 units 72 units
Badalona II 720 m 144 m 18 units 108 units

Demolition of pump buildings in Badalona 1 and Sant Adrià 1 and 2.

The main works to be carried out on each of the jetties are:

  • Dismantling pipelines.
  • Dismantling benches.
  • Dismantling slabs.
  • Dismantling longitudinal beams (Badalona I and II).
  • Dismantling lintels.
  • Removing piles.
  • Final site clean-up.
  • Demolition and disposal of all material in tanks.

Related projects

Ampliación planta incineradora con recuperación de energía de Son Reus, Mallorca

Expansion of the Son Reus energy recovery incinerator plant

Construcción nueva unidad de refino crudo para la obtención de combustibles, Sines

Construction of new crude oil refining unit for fuel production, Sines

Montaje mecánico Hydrocracker refinería petróleo

Mechanical assembly of hydrocracker oil refinery

Central Térmica de Ciclo Combinado de 1.200 MW, Maasbracht, Holanda

Combined cycle 1,200 MW power station, Maasbracht

Manufacturing and assembly of a modular plant

Manufacture and assembly of a modular plant

Construcción de planta de biocombustibles en Zierbana

Biofuels plant at Zierbana

Construction of the Facultats underground substation

Fabricación y montaje de una planta modular de CCR

Manufacture and assembly of a modular CCR plant