Expansion of the Son Reus energy recovery incinerator plant

  • Mallorca

This turnkey project consisted of the detailed engineering required for the supply, manufacture, and assembly of the systems specified in this lot, and the supply, manufacture, transport, and assembly of all equipment and materials, as well as the commissioning of the facilities.
The systems included are:
• Water-steam cycle, including: HP, MP and LP steam systems, HP, MP and LP condenser systems, condensate preheating, HP-LP reducer station, flash tank, auxiliary condensate pumps, demineralized water tank, degasser and boiler feed water tank, boiler feed water pumps, feed water system, etc.
• Water distribution system including systems for drinking water, mains water, rainwater, wastewater, etc.
• Compressed air system: air compressors, chillers for service air treatment, instrument air treatment, accumulator boilers, service and instrument air distribution systems, etc.
• Diesel and waste oil systems.
• Auxiliary cooling system consisting of a cooling tower, cooling water circuit and pumps.
• Centralized vacuum cleaning system.
• HVAC: air conditioning for electrical and transformer rooms, general ventilation for the boiler room, emergency staircase pressurization, etc.
• Instrumentation and control.

Related projects

Construcción nueva unidad de refino crudo para la obtención de combustibles, Sines

Construction of new crude oil refining unit for fuel production, Sines

Montaje mecánico Hydrocracker refinería petróleo

Mechanical assembly of hydrocracker oil refinery

Central Térmica de Ciclo Combinado de 1.200 MW, Maasbracht, Holanda

Combined cycle 1,200 MW power station, Maasbracht

Manufacturing and assembly of a modular plant

Manufacture and assembly of a modular plant

Construcción de planta de biocombustibles en Zierbana

Biofuels plant at Zierbana

Dismantling electromechanical equipment

Construction of the Facultats underground substation

Fabricación y montaje de una planta modular de CCR

Manufacture and assembly of a modular CCR plant