Mechanical assembly of hydrocracker oil refinery
-
Tarragona
Supply, prefabrication and assembly of steel frame.
Prefabrication and assembly of pipe in processing unit.
Fitting equipment.
Main works units:
• Prefabrication and assembly of piping 1.325 t (59.300 m)
• Fitting equipment 2,366 t
• Piping brackets 160 t
• Metal structure: 490 t
• Steam tracing 39.000 m
• Painting 65.000 m
• Carbon steel 212.000 inch diam.
• Stainless steel 8.500 inch diam.
• Alloy steel 1.000 inch diam.